Broadway Neighborhood Greenway Project – Capturing the Water Rights

Date / Time:
Wednesday, Oct 17 9:45am to 10:15am
Location:
Meeting Room 1-3 (Lower Level)
Track / Session:
Sustainability Track / Scaling Sustainability
Description/Abstract: 

The award-winning Broadway Neighborhood Greenway Project is a regional stormwater and dry-weather runoff augmentation project developed to meet Los Angeles River water quality requirements with an auxiliary benefit of recharging approximately 41 acre-feet per year of water into the Central Basin. The Project, commissioned in 2016, has been actively collecting, treating, and infiltrating stormwater and dry weather runoff for over two years. The successful implementation of this Project was achieved through a partnership between the City of Los Angeles - Los Angeles Sanitation (LASAN, LADWP), the State Water Resources Control Board (SWRCB) - Stormwater Grant Program (SWGP), the Water Replenishment District of Southern California (WRD), The Council for Watershed Health (CWH), Santa Monica Bay Restoration Commission (SMBRC), Los Angeles Department of Public Works Bureau of Engineering (LABOE) and Geosyntec Consultants. Los Angeles Department of Water and Power (LADWP), under the advisory of WRD, has also started the first ever Water Augmentation Project Application for an increase to their annual groundwater pumping rights allocation from stormwater captured in the Broadway Neighborhood Greenway Project and recharged into the Central Basin.
The Broadway Neighborhood is highly urbanized and one of the most densely developed areas of the South Los Angeles region. The neighborhood is south of the I-10 and east of I-110 Freeways. Runoff from the Broadway Neighborhood discharges to the Los Angeles River, an impaired water body due to stormwater and dry weather runoff from dense clusters of commercial, industrial, and residential developments and urban activities. The Project is directly improving LA River water quality, augmenting local water supplies in the Central Basin, and assisting with urban flood management within the neighborhood through the deployment of Low Impact Development (LID) and Stormwater Control Measures (SCMs).
The Broadway Neighborhood Stormwater Greenway Project diverts flows from a 220-acre watershed area for stormwater capture and infiltration through four levels of LID/SCM constructed in private properties, road ends and a under a parking lot. During the initial monitoring period, 96 percent of the equivalent runoff from the Project design area was captured and infiltrated. Additional volume from the upstream tributary area was also captured and infiltrated over the course of the monitoring period, increasing the equivalent capture efficiency to well-beyond 100% of the design capture efficiency. Results of the past two years of monitoring are in progress and will be discussed in the future. In addition, the residential component of the Project continues to help residents conserve water by reducing irrigation demands through turf replacement using drought-tolerant rain gardens, native landscaping, and mulching. The Project provided open space benefits and pedestrian friendly green connections within the community throughout the residential neighborhoods and the commercial district. This Project effectively shows how stormwater and urban runoff is captured and treated on site using the system of LID/SCMs installed, thereby reducing the overall pollutant load from the Project’s watershed area and providing a new source of sustainable water to augment the local water supply in the Central Basin.
The Project was funded from the State of California Water Resources Control Board Proposition 84, LASAN, City of Los Angeles Proposition O, the Water Replenishment District of Southern California, and other funding sources.
LADWP staff will also be available to provide an overview of the project, discussion of water rights in the Central Basin, and answer technical and policy questions.

Primary Speaker:
Chris Repp, Los Angeles Department of Water and Power
Supporting Speaker 1:
Mark Hanna, Geosyntec Consultants
Primary Speaker Biography: 

Chris Repp is a Cal Poly Pomona Chemical Engineering Bachelors graduate with a Masters in Civil Engineering from Cal State University, Fullerton. Mr. Repp is a registered Civil Engineer with 13 years of engineering experience with the City of Los Angeles, in the Bureau of Sanitation, Engineering, and now, LADWP. His expertise lies mainly in Water Resources, having resided there for the past 9 years, more recently focusing in on Groundwater Rights and Development. Now leading the effort on LADWP’s Groundwater Development and Augmentation Plan, Mr. Repp routinely engages in strategic planning, inter-agency coordination, and groundwater project development.

Supporting Speakers Biographies: 

Dr. Mark Hanna is a California registered professional engineer and a senior principal managing Geosyntec Consultants’ Downtown Los Angeles office. Mark specializes in large system hydraulics, hydrology, surface water and groundwater management, and ecosystem restoration. He provides civil engineering and managerial oversight for multi-sector clients including governmental agencies, private developers, and non-profit organizations alike. His 20 plus years of experience in water resources and integrated planning allows him to offer multi-sector clients comprehensive water resource solutions in the natural and urban environment.